Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1300118 <br /> David and Corene Phillips TR <br /> (Go Mike Smith Engineering, Inc.) <br /> Use Permit Application No. PA-1300118 was approved by the San Joaquin County Planning <br /> Commission on December 19, 2013. The effective date of approval is December 29, 2013. This <br /> approval will expire on June 30, 2015, which is 18 months from the effective date of approval, unless <br /> (1) all Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Mo Hatef, 209-468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of a large winery to be built in four phases <br /> over a fifteen year period as shown on the Revised Site Plan dated December 5, 2013 (Use Type: <br /> Wineries and Wine Cellars—Winery, Large). Twenty-five marketing events per year are also <br /> approved with a maximum attendance of 150 people as shown on the proposed marketing plan <br /> dated July 15, 2013. <br /> Phase One, building permits to be issued within 18 months from the effective date of approval, <br /> includes the construction of a 7,000 square foot office building and the conversion of an existing <br /> 10,000 square foot agricultural building into a winery production building. <br /> Phase Two, building permits to be issued within five years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 600 square foot <br /> crush pad, wine tank farm expansion, and a 900 square foot restroom building. <br /> Phase Three, building permits to be issued within ten years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 24,000 square foot <br /> case goods storage building and wine tank farm expansion. <br /> Phase Four, building permits to be issued within, fifteen years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building. <br /> Conditions of Approval - 1 - <br />