My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012147
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RAY
>
14647
>
2600 - Land Use Program
>
PA-1300118
>
SU0012147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:39 AM
Creation date
9/9/2019 9:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012147
PE
2656
FACILITY_NAME
PA-1300118
STREET_NUMBER
14647
Direction
N
STREET_NAME
RAY
STREET_TYPE
RD
City
LODI
Zip
95242-
APN
05516029, 41, 50, & 51
ENTERED_DATE
1/15/2019 12:00:00 AM
SITE_LOCATION
14647 N RAY RD
RECEIVED_DATE
2/14/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\4580\PA-1300118\SU0012147\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1300118 <br /> PHILLIPS FARMS, LLC./MICHAEL HAKEEM <br /> Revised Conditions of Approval <br /> Revisions of Previously Approved Action for a previously approved Use Permit Application No. PA- <br /> 1300118 was approved by the San Joaquin County Planning Commission on November 1, 2018.This <br /> approval will expire on May 1, 2020, which is 18 months from the effective date of approval, unless <br /> (1) all Conditions of Approval have been complied with and (2) all necessary building permits have <br /> been issued and remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Stephanie Stowers, [209]468-9653) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b. APPROVED USE: This approval is for the expansion of a large winery to be built in four phases over <br /> fifteen years as shown on the Revised Site Plan dated DeGember F 2013 October 3, 2017 (Use <br /> Type: Wineries and Wine Cellars—Winery, Large). Twenty-five marketing events per year are also <br /> approved with a maximum attendance of 4-59 300 people as shown on the proposed marketing <br /> plan dated July 15, 2013. <br /> Phase One, building permits to be issued within eighteen (18) months from the effective date of <br /> approval, includes the construction of a 7,000 square foot office building and the conversion of an <br /> existing 10,000 square foot agricultural building into a winery production building. <br /> Phase Two, building permits to be issued within five (5) years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 600 square foot <br /> crush pad, wine tank farm expansion, and a 900 square foot restroom building. <br /> Phase Three, building permits to be issued within ten (10)years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 24.000 square foot <br /> case goods storage building and wine tank farm expansion. <br /> Phase Four, building permits to be issued within fifteen (15) years from the effective date of <br /> approval, includes the construction of a 24,000 square foot barrel warehouse building. <br /> c. MARKETING EVENTS: Marketing Events are subjected to the following regulations: <br /> 1) A maximum of twenty-five(25) marketing events are permitted annually as a part of the proposed <br /> marketing plan dated July 15, 2013. <br /> 2) Each event shall have a maximum attendance of 459 300 people. <br /> PA-1300118 (UP, RAA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.