Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1300118 <br /> PHILLIPS FARMS, LLC./MICHAEL HAKEEM <br /> Revised Conditions of Approval <br /> Revisions of Previously Approved Action for a previously approved Use Permit Application No. PA- <br /> 1300118 was approved by the San Joaquin County Planning Commission on November 1, 2018.This <br /> approval will expire on May 1, 2020, which is 18 months from the effective date of approval, unless <br /> (1) all Conditions of Approval have been complied with and (2) all necessary building permits have <br /> been issued and remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Stephanie Stowers, [209]468-9653) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b. APPROVED USE: This approval is for the expansion of a large winery to be built in four phases over <br /> fifteen years as shown on the Revised Site Plan dated DeGember F 2013 October 3, 2017 (Use <br /> Type: Wineries and Wine Cellars—Winery, Large). Twenty-five marketing events per year are also <br /> approved with a maximum attendance of 4-59 300 people as shown on the proposed marketing <br /> plan dated July 15, 2013. <br /> Phase One, building permits to be issued within eighteen (18) months from the effective date of <br /> approval, includes the construction of a 7,000 square foot office building and the conversion of an <br /> existing 10,000 square foot agricultural building into a winery production building. <br /> Phase Two, building permits to be issued within five (5) years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 600 square foot <br /> crush pad, wine tank farm expansion, and a 900 square foot restroom building. <br /> Phase Three, building permits to be issued within ten (10)years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 24.000 square foot <br /> case goods storage building and wine tank farm expansion. <br /> Phase Four, building permits to be issued within fifteen (15) years from the effective date of <br /> approval, includes the construction of a 24,000 square foot barrel warehouse building. <br /> c. MARKETING EVENTS: Marketing Events are subjected to the following regulations: <br /> 1) A maximum of twenty-five(25) marketing events are permitted annually as a part of the proposed <br /> marketing plan dated July 15, 2013. <br /> 2) Each event shall have a maximum attendance of 459 300 people. <br /> PA-1300118 (UP, RAA) Conditions of Approval 1 <br />