Laserfiche WebLink
PA-1300222 (SA), S00009927 Page 2 <br /> 20325 N Ray Rd, Lodi February 19,2014 <br /> D. Construction of an individual sewage disposal system(s) under permit and inspection <br /> by the Environmental Health Department is required at the time of development based <br /> on the Soil Suitability/ Nitrate Loading Study findings (San Joaquin County <br /> Development Title, Section 9-1110.3 & 9-1110.4). <br /> E. Submit three (3) sets of detailed kennel construction plans to the Environmental Health <br /> Department for review prior to construction. The Environmental Health Department has <br /> specific requirements of kennel construction. A plan check fee of $250 is due at the <br /> time of submittal to the Environmental Health Department. <br /> F. Kennels are subject to a yearly permit, a fee and inspection by the Environmental <br /> Health Department. <br /> G. A convenient water supply and waste water disposal system meeting the requirements <br /> of the Environmental Health Department shall be available for washing food <br /> preparation equipment, bathing of animals, as well as washing down shelters and pens <br /> or dog runs. <br /> Note: <br /> An intent to reserve of easement to provide domestic water supply from the adjacent <br /> parcel with existing well shall be recorded prior to final approval. <br /> H. All liquid and solid wastes and vector problems associated with this kennel operation <br /> are to be retained on the premises so as not to cause a nuisance or a health problem. <br /> Any complaints that are verified against this site will be charged the Environmental <br /> Health Department hourly rate of $125 for response and correction, as per the Board of <br /> Supervisor's Resolution B-92-1591. <br /> I. Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 1115.3 and 9-1115.6). <br /> J. An intent to reserve of easement to provide domestic water supply shall be recorded <br /> prior to final approval. <br />