Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-841 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. ( $187.15 per additional daily trip-end generated in the Lodi area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. Regional Traffic Impact may be required for this development. The fee is due and payable at the time of <br /> building permit application. (Resolutions R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:DG: <br /> P:\CO)•NfENPS\SA\YR 2005\PA-0500841.wpd <br />