Laserfiche WebLink
U*"b <br /> THOMAS R. FLINN P.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> DIRECTOR pw( h STOCKTON, CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)466-2999 <br /> www.sjgov.org/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Warldngfm YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> February 19, 2008 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner- <br /> Community Development Department <br /> CONTACT PERSON: Jason Jones <br /> FROM: Bill DuBois, Engineer III <br /> Public Services Division <br /> SUBJECT: PA-08-04 A SITE APPROVAL APPLICATION TO ESTABLISH AN OFF-SITE WINE <br /> CELLAR IN 200 SQUARE:FEET OF AN EXISTING OFFICE AND AGRICULTURAL <br /> STORAGE BUILDING (BUILDING 5)AND TO ESTABLISH A 150 SQUARE FOOT WINE <br /> TASTING ROOM IN AN EXISTING OFFICE BUILDING(BUILDING 7), LOCATED ON <br /> THE EAST SIDE OF RAY ROAD, 3,200 FEET SOUTH OF PELTIER ROAD. <br /> (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Dino Mencarini, Trust APPLICANT: Abundance Vineyards <br /> ADDRESS: 21400 N. Ray Road APN: 013-020-27, 28 & 29 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Ray Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. Any new driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $207.97 per additional daily trip-end generated in <br /> the Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br />