Laserfiche WebLink
Conditions of Approval <br /> SA-92-7 <br /> Page 2 <br /> i . No signs are allowed. <br /> j . A valid San Joaquin County Business License and PUC <br /> permit shall be required. <br /> k. No employees are allowed other than immediate family. <br /> (Section 3136 . 1) <br /> 1. The owner-operator of the trucking business shall also <br /> own and reside on the property. (Section 9-3136 . 1) <br /> M. Only one truck and two trailers are permitted to park on <br /> the property. (Section 9-4005 . 4 (g) (2) ) <br /> 2 . DEPARTMENT OF PUBLIC WORKS: <br /> a. Ded a 30-foot wide right-of-way from <br /> the � ' Dad to the property line shall be <br /> req stage of APN 011-180-30 . (Section <br /> 9-2 <br /> b. The vent for Ray Road shall be <br /> con nce with the standards for one- <br /> hal ght-of-way rural street. The <br /> consLruczion of the frontage improvements will be <br /> deferred upon execution by the owner of a Deferred. <br /> Frontage and Roadway Improvement Agreement or a Secured. <br /> Deferred Frontage and Roadway Improvement Agreement with <br /> a deposit equivalent to their estimated construction <br /> costs prior to issuance of a building permit. (A $250 . 00 <br /> fee is currently required for processing per Planning <br /> Title Section 9-10502 in addition to a copy of the Grant <br /> Deed and an . estimate for the required frontage <br /> improvements. The estimate shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing <br /> on a form to be supplied by the Public Works Department <br /> and submitted to the Public Works Department for <br /> approval . As an option the Department of Public Works <br /> will prepare the drawing and estimate for an additional <br /> fee of $100 . 00 . ) (Planning Title Section 9-2143 ) <br /> C. Encroachment Permit shall be required for work within <br /> road right-of-way. (Streets and Highway Title Section <br /> 10-3101) <br /> d. The Traffic Impact Mitigation Fee will be required aY®v <br /> this development. The fee is due and payable at the time <br /> of building permit application. (The fees currently ire <br />