Laserfiche WebLink
SR33,762 <br /> Addendum No. 1 <br /> The purpose of this addendum is to include a full size tentative parcel map in the report. <br /> Additional comments are furnished as follows: <br /> As no water was observed in test holes at start of the four hour testing, Procedure #2 was used. <br /> All holes were sleeved. The reference point was the top of the PVC pipe. The size of the SFR's <br /> to be constructed is unknown. No work is proposed on Parcel 2, as this parcel is fully developed. <br /> The drilling results indicate two layers of percable strata. Only two records were found indicating <br /> repairs to the septic systems on Reid Road. Copies of the repairs are included in this addendum <br /> along with a copy of the satisfactory percolation test results of Jun 14, 1995 Permit. <br /> The testing observed and the research completed do not indicate this area to be a problem area <br /> with respect to on site septic systems functioning satisfactorily. The important factor is proper <br /> usage and maintenance. <br /> Earnest F. Smith <br /> APN 183-320-56,57, Por. 58 <br /> 1. <br />