Laserfiche WebLink
Rick Griffin <br /> COMMUNITY DEVELOPMENT <br /> PA-0800200 (SA) <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 3. Applicant shall provide verification that the State Water Resources Control Board has determined if an <br /> Industrial Storm Water Permit will be required for this project. <br /> 4. Wastewater shall not be allowed into the storm drainage system. <br /> BD: <br /> \\sipwgov.org\shares\DevServices\DPubServ\COMMENTS\SA\Yr 2008\PA-0800200 rev.doc <br />