My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002228
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
18700
>
2600 - Land Use Program
>
UP-98-01
>
SU0002228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 9:04:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002228
PE
2626
FACILITY_NAME
UP-98-01
STREET_NUMBER
18700
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
RIPON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18700 E RIVER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\18700\UP-98-01\SU0002228\APPL.PDF \MIGRATIONS\R\RIVER\18700\UP-98-01\SU0002228\CDD OK.PDF \MIGRATIONS\R\RIVER\18700\UP-98-01\SU0002228\EH COND.PDF \MIGRATIONS\R\RIVER\18700\UP-98-01\SU0002228\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation WOrxplan — - 2 - <br /> Monitoring <br /> 2 - <br /> Monitoring Well Installation Report <br /> F. Soil Sampling (if applicable): <br /> Cuttings disposal method <br /> Analyses to be run and methods — <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.1 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> Monitoring Well Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s) wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> Total depth drilled <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> (':Wqa FiY`S.r.U4.vasmw.11 wNGz <br />
The URL can be used to link to this page
Your browser does not support the video tag.