Laserfiche WebLink
oP4V.lry o O <br /> �. / <br /> KRIS BALAJI f�'; P.0.BOX ST CKT-1810 E. FORMAHAZELTON AVENUE <br /> DIRECTOR Y'4�"t� �1 A STOCKTON,CALIFORNIA 96207 <br /> vy� (209)468-3000 FAX(209)468-2999 <br /> •o., P• w Sjgov.org/pubworks <br /> gCIFO HN a... J <br /> v, <br /> MICHAEL SELLING CTS J <br /> DEPUTY DIRECTOR <br /> FRITZ BUCHMAN k3 RECEIVED <br /> DEPUTY DIRECTOR <br /> JIM STONE MAY 2 7 2016 <br /> DEPUTY DIRECTOR <br /> ROGER JANES SSeA Joaquin Cotn* <br /> BUSINESS ADMINISTRATOR C01g9111unitY Development <br /> May 4, 2016 W l <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Stephanie Stowers <br /> FROM: Alex Chetley,Engineering Services ManagerC� <br /> Development Services Division �r� <br /> SUBJECT: PA-1600076; A Site Approval application to expand a custom agricultural manufacturing facility in <br /> three phases over eightyears. Phase I to include the construction of a 16,800 square foot sand blast <br /> and warehouse building. Phase 2,to be completed within 5 years, includes the construction of a <br /> 4,973 square foot warehouse building and an 8,669 square foot warehouse building. Phase 3, to be <br /> completed within 8 years,to include the construction of two 8,000 square foot warehouse buildings; <br /> located on the south side of E. River Road, 2,300 feet east of Brennan Road,Escalon. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Wayne Morrill APPLICANT: Norman Wilson <br /> ADDRESS: 24754 E. River Road,Escalon APN: 247-090-31 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood Hazard Area. <br /> River Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from this application. <br /> The fee is due and payable at the time of building permit application. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for any incremental traffic resulting from this <br /> application. The fee is due and payable at the time of building permit application. The fee will be based on <br /> the current schedule at the time of payment. (Resolution R-06-3 8) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building pennit. <br />