Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-97-15 <br /> 3 . The owner shall execute an Irrevocable Offer and Agreement to <br /> Dedicate Road to result in a forty-two (42) foot wide right-of-way <br /> from the centerline of River Road to the property line across the <br /> parcel' s frontage. (A $225 . 00 fee currently is required for <br /> processing per Development Title Table 9-240 .2 in addition to a <br /> copy of the Grant Deed and a legal description of the parcel to be <br /> offered for dedication. ) <br /> (Development Title Section 9-1150 .5) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of building <br /> permit application. (The fee currently is $527 . 00 per 1, 000 gross <br /> square foot of building as Manufacturing or $136 . 93 per daily <br /> trip-end generated in the Escalon area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and <br /> R-96-592) <br /> TMI :gn <br /> PS-7FISS.M <br /> E: Manuel Lopez, Deputy Director/Development <br />