Laserfiche WebLink
t <br /> Rick Griffin -2- <br /> Community Development Department <br /> SA-97-0015 <br /> 3. The owner shaW emeeute an h-evoeable Offer al d AgFeement to Dedioate Rond to result in a fimly two (42) fee! <br /> wide right of way ffem the eentefline of Rivej- Read to the prepet4y line nei ess the • r-u-asv�(A-scv <br /> based on the eurfent fee selledule at time of payment is requ itzed for process 6 ng per evelopment Title Table 9 <br /> 240.2 in addition te a eopy efibe G-mait-Deed H"d H legi"eseeiption of!he pat-eel to be aMl-ed fbr a) <br /> (Development Title Seetien 9 1150.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the time <br /> of building permit application for each phase of the project. The fee shall be automatically adjusted July I of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 5. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building1jermit application for each phase of the proiect The fee will be based on the current <br /> schedule at the tune of moment. (Resolution R-06-381 <br /> Informational Notes: <br /> (i.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements (Title 9. Chapter 9-1605) <br /> and all requirements of the State of California (CCR Title 23) that are in force at the time of permit <br /> issuance As an example these requirements may include raising the finish floor elevation one foot above <br /> the expected flood level and/or using flood resistant materials, <br /> ACIDS <br /> ❑sjpugov.orglsltaresl Dei,Sen,IcesOPabSen,l c0 olENTS W07?1993 and earherlSA-9LOOl5.doc <br />