My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005187
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
PA-0500403
>
SU0005187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:31 AM
Creation date
9/9/2019 9:06:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005187
PE
2605
FACILITY_NAME
PA-0500403
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722018
ENTERED_DATE
7/6/2005 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/6/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\APPL.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\CDD OK.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH COND.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. A minimum factor of safety of 1.5 against static surficial failure. <br /> C. A minimum factor of safety of 1.1 against seismic failure; <br /> (4) Temporary Cut Slopes at Setback Lines. Temporary cut slopes (i.e., for limited periods of time, <br /> slopes that are in the process of extraction prior to being backfilled) at setback lines shall not <br /> exceed one (1) foot horizontal to one (1) foot vertical, except that temporary cut slopes at <br /> setback lines to a maximum of one half(1/2) of a foot horizontal to one (1) foot vertical may be <br /> maintained if site-specific geologic and engineering analysis demonstrate through a slope <br /> stability analysis that the proposed temporary cut slopes will have a minimum slope stability <br /> factor of safety as required in Section 9-1415.3(k)(4). However, in the event that there are <br /> existing structures on the adjacent property (or the immediate potential for structures on the <br /> adjacent property), the excavation shall at not time be closer to the property line than a line <br /> projected on a slope of one (1)to one(1)from the property line to the toe of slope. <br /> (5) Final Slopes. Final cut and/or fill slopes shall not exceed two (2) feet horizontal to one (1) foot <br /> vertical, except as specified below: <br /> A. Final slopes to a maximum of one and one-half(1 1/2)feet horizontal to one (1)foot vertical <br /> may be maintained when site-speck geologic and engineering analysis demonstrate <br /> through a slope stability analysis that the proposed final slopes will have a minimum slope <br /> stability factor of safety as required in Section 9-1415.2(k)(4), while demonstrating suitability <br /> for the proposed end use and protecting against erosion (by means of revegetation or other <br /> methods approved by Development Services Division). <br /> B. Final slopes to a maximum of one (1) horizontal foot to one (1) foot vertical may be <br /> maintained under water(beginning five(5)feet below the lowest water table on the property <br /> experienced in the preceding three (3) years) when site-specific geologic and engineering <br /> analysis demonstrate through a slope stability analysis that the proposed saturated slopes <br /> will have a minimum slope stability factor of safety as required in Section 9-1415.2(k)(4); <br /> (6) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a qualified <br /> civiVgeotechnical engineer based upon site-specific geologic conditions; <br /> m. FENCING: Fencing four(4)feet in height consisting of not less than three(3)strands of barbed wire, <br /> or an approved equivalent, shall be placed around the excavation area where slopes steeper than <br /> two (2) feet horizontal to one (1) foot vertical are maintained. Six(6)foot high security fencing or an <br /> approved equivalent shall be required where slopes steeper than two (2) feet horizontal to one (1) <br /> foot vertical are created, if the proximity of such slopes to residential uses or other uses involving a <br /> concentration of people so warrants. (Development Title Section 9-1415.3[1]) <br /> n. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1415.3[0]) <br /> o. TIME LIMITATION: The Quarry Excavation Permit shall expire four (4) years from the date of <br /> approval. <br /> p. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br /> may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br /> Conditions of Approval -3 - PA-0500403 <br />
The URL can be used to link to this page
Your browser does not support the video tag.