My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005187
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
PA-0500403
>
SU0005187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:31 AM
Creation date
9/9/2019 9:06:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005187
PE
2605
FACILITY_NAME
PA-0500403
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722018
ENTERED_DATE
7/6/2005 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/6/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\APPL.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\CDD OK.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH COND.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimum slope stability factor of safety as required in Section 9- <br /> 1415.2(k)(4); <br /> (6) Fill Slopes. Fill slopes shall be constructed consistent with recommendations <br /> from a qualified civil/geotechnical engineer based upon site-specific geologic <br /> conditions; <br /> m. FENCING: Fencing four (4) feet in height consisting of not less than three (3) <br /> strands of barbed wire, or an approved equivalent, shall be placed around the <br /> excavation area where slopes steeper than two (2) feet horizontal to one (1) foot <br /> vertical are maintained. Six (6) foot high security fencing or art approved equivalent <br /> shall be required where slopes steeper than two (2) feet horizontal to one (1) foot <br /> vertical are created, if the proximity of such slopes to residential uses or other uses <br /> involving a concentration of people so warrants. (Development Title Section 9- <br /> 1415.3[1]) <br /> n. SCREENING AND LANDSCAPING: Screening consistent with Chapter 9-1020 is <br /> required. (Development Title Section 9-1415.3[m]). <br /> o. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the <br /> phases of excavation. Reclamation on one phase of an excavation shall be <br /> initiated prior to the start of the next excavation phase. The final reclamation of any <br /> phase of excavation shall be completed within two years of the commencement of <br /> the reclamation process. Excavation shall be limited so that at any point of time a <br /> maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1415.3[0]) <br /> p. TIME LIMITATION: The Quarry Excavation Permit shall expire four (4) years from <br /> the date of approval. <br /> q. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit <br /> and the reclamation plan. The County may use professional services as provided <br /> for in Section 9-240.11. The consultant shall be selected by San Joaquin County. <br /> Upon completion of the annual inspection, the person in charge of the mining <br /> operation shall submit to the State Geologist and the County a report which shall <br /> contain all the information as required by Section 2207 of the Public Resources <br /> Code. The cost of the inspection shall be paid by the mine operator. Additional <br /> inspections may be conducted, but the cost of additional inspections shall be paid <br /> for by the mine operator only if non-compliance with the conditions of the Quarry <br /> Excavation Permit or the reclamation plan is found. (Development Title Section 9- <br /> 1415.3[q]) <br /> r. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, <br /> compliance with conditions of approval, and compliance with County and state <br /> mining regulations, the applicant shall provide performance guarantees as a <br /> condition of the issuance of the Quarry Excavation Permit. The amount and form of <br /> the guarantee shall be subject to annual review and approval by the County and the <br /> state, and the amount shall be adequate to ensure reclamation of disturbed land <br /> and/or land to be disturbed during a given phase. The annual review of the <br /> financial guarantee shall be coordinated with the annual inspection and approval of <br /> successive reclamation security so that the guarantee includes the amount of <br /> disturbed land plus the amount of land estimated to be disturbed during the next 12 <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.