My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Mitigation Monitoring and Reporting Program <br /> TABLE 10-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Monitoring/Reporting <br /> Impact Mitigation Measure Implementation Timing Responsibility Timing <br /> Visual and Lighting Measure 3.1.1:All outdoor lighting will be required to be fully shielded and Requirements shall be Community Development Lighting plans shall be <br /> shall adhere to Section 9-1025.6 of the Development Code in order to incorporated into the design Department reviewed and approved prior <br /> minimize any impacts resulting from outdoor lighting on adjacent properties. of any proposed or required to issuance of permit for any <br /> exterior lighting new exterior lighting <br /> Air Quality and Measure 3.3.1:The operator shall incorporate additives to the rubberized Ongoing during all nighttime Community Development Operator shall maintain <br /> Climate Change asphalt mix in accordance with accepted industry standards.The objective of operations. Department[note that the records of all night time <br /> the additives shall be to reduce offensive odors associated with the production SJVAPC also has the operations, including any <br /> of rubberized asphalt.The operator shall consider technological authority to investigate odor contacts from the Air District <br /> improvements to reduce odors,as they become available,and incorporate if complaints] or others regarding odor <br /> feasible. complaints,and produce <br /> The operator shall ensure that loading,unloading,and material handling those records to the County <br /> activities are carried out efficiently and without delays to avoid excessive upon request. <br /> odors. <br /> The operator shall use water trucks and/or sprinkler systems to reduce the <br /> potential dust associated with the operation. <br /> Noise Measure 3.4.1:All project trucks shall be operated using noise-mitigating Operator shall inform all Community Development Operator shall maintain <br /> operating parameters when entering or leaving the plant on East River Road. truck operators of the Department records of all night time <br /> Based on testing conducted by Bollard Acoustical Consultant,Inc.,the requirements and maintain a operations,including the <br /> quietest haul truck operating parameters were as follows: full-time monitor during night presence of a truck monitor, <br /> • Empty Trucks: Travel speed at 38-43 mph with engines in 8t"gear time operations. and provide those records to <br /> at 700-800 rpm. the County upon request <br /> • Loaded Trucks: Travel speed of 33.35 mph with engines in 6"or <br /> 7t"gear at 1,400-1,600 rpm. <br /> Furthermore,truck parking anywhere along River Road and the use of jake <br /> brakes at the McHenry Ave/E.River Road intersection and the E.River <br /> Road/project driveway is prohibited.The applicant shall monitor full time for <br /> compliance with these requirements beginning 30 minutes prior to any <br /> approved extended hour operations. <br /> Munn 8 Perkins Quarry Excavation Permit 10--3 San Joaquin County Community Development Department <br /> Final Environmental Impar!Report November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.