My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Changes to Mitigation Measures. <br /> As described in the Final EIR and in the responses to comments, Mitigation Measure 3.3.has <br /> been modified. The Commission finds that these changes to the mitigation measures in the Final <br /> EIR augment the mitigation measures as proposed in the Draft EIR, strengthen the effectiveness <br /> of the proposed mitigation measures,respond to public input, and enhance their clarity, but do <br /> not cause any new or more severe environmental impacts. Therefore, in accordance with CEQA <br /> and the CEQA Guidelines,no recirculation of the EIR is necessary based on the changes and <br /> additions to the mitigation measures in the Final EIR. <br /> Other Changes. <br /> Various minor changes and edits have been made to the text,tables, and figures of the Draft EIR. <br /> These changes are generally of an administrative nature such as correcting typographical errors, <br /> making minor adjustments to the data, and adding or changing certain phrases to improve <br /> readability and enhance clarity. The Commission finds that these changes are of a minor,non- <br /> substantive nature and do not require recirculation of the EIR. <br /> In addition to the changes and corrections described above,the Final EIR provides additional <br /> information in response to comments and questions from agencies and the public. The <br /> Commission finds that this additional information does not constitute significant new <br /> information requiring recirculation, but rather that the additional information clarifies or <br /> amplifies an adequate EIR. Specifically,the Commission finds that the additional information <br /> including the changes described above, does not show that: <br /> (1) A new significant environmental impact would result from the project or <br /> from a new mitigation measure proposed to be implemented. <br /> (2) A substantial increase in the severity of an environmental impact would result <br /> unless mitigation measures are adopted that reduce the impact to a level of <br /> insignificance. <br /> (3) A feasible project alternative or mitigation measure considerably different <br /> from others previously analyzed would clearly lessen the significant <br /> environmental impacts of the project,but the project's proponents decline to <br /> adopt it. <br /> (4) The draft EIR was so fundamentally and basically inadequate and conclusory <br /> in nature that meaningful public review and comment were precluded. <br /> Findings: <br /> Based on the foregoing Section C.5 of these Findings, and having reviewed the information <br /> contained in the Final EIR and in the record of Agency's proceedings, including the comments <br /> on the Draft EIR and the responses thereto, and the above-described information, the <br /> Commission hereby finds that no significant new information has been added to the Final EIR <br /> since public notice was given of the availability of the Draft EIR that would require recirculation <br /> of the EIR. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.