Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0200370 <br /> The Reed Leasing Group <br /> (Go George Reed, Inc.) <br /> Revisions of Approved Actions for Quarry Excavation Application No. PA-0200370 was approved by <br /> the San Joaquin County Planning Commission on December 5, 2013. The effective date of approval <br /> is December 15, 2013. This approval will expire on December 31, 2029, unless (1) all Conditions of <br /> Approval have been complied with, (2)all necessary building permits have been secured and remain <br /> in force, and (3)all necessary permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: John Funderburg, 468-3160) <br /> a. APPROVAL: This is a Quarry Excavation application to remove approximately 2.4 million cubic <br /> yards of rock, sand, and gravel from approximately 71 acres of an 80-acre site over a 26-year <br /> period. The mining will occur in three phases. Phase 1 shall consist of 30 acres to be reclaimed <br /> by 2019. Phase 2 shall consist of 15 acres to be reclaimed by 2023. Phase 3 shall consist of 26 <br /> acres to be reclaimed by 2029. The material that is excavated shall be transported by conveyor <br /> belt underground approximately 0.10 miles west on River Road to an existing processing facility. <br /> Reclamation is proposed to be continuous and concurrent with mining. The quarry shall be <br /> replanted in either walnuts or almonds in 15-to 30-acre increments. <br /> b STOCKPILING: No stockpiled soil or material shall be placed closer than twenty five (25) feet to a <br /> property boundary. (Development Title Section 9-1415.3[b]) <br /> c. PRIVATE ROADS: All private roads involved in an excavation shall be maintained to control the <br /> creation of dust. The first one hundred (100) feet of any private road on the property which intersects <br /> with a publicly maintained road shall be surfaced in a manner approved by the Director. Traffic <br /> control and warning signs shall be installed, if required, at such intersections. The placement and <br /> size of these signs shall be approved by the Director of Public Works. (Development Title Section 9- <br /> 1415.3[c]) <br /> d_ EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> e. HOURS OF OPERATION: Excavation operations shall normally be carried on during the hours from <br /> 5:00 a.m. to 9:00 p.m. (Development Title Section 9-1415.3[f]) <br /> f. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit. (Development Title Section 9-1415.3[g]) <br /> g. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agriculture Commissioner of San Joaquin County. (Development Title Section <br /> 9-1415.3[h]) <br />