Laserfiche WebLink
PA ® ® 7000 $ 5 <br /> P�U'N MAJOR SUBDIVISION <br /> �n SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> c,FoR� BUSINESS HOURS: 8:00 A.M. TO 5:00 P.M. .(Monday through Friday) <br /> APPLICATION PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF—Development Services Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION—When you apply, file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks are payable to the San <br /> Joaquin County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must sign. <br /> • DEED One(1)copy of recorded deed(s)of the property. <br /> • TENTATIVE MAP Seven (7)copies of a folded tentative map(see attached)and two(2)copies of a legible 8-1/2" x 11" <br /> site map. <br /> • TITLE REPORT One copy of a preliminary title report of the property. <br /> • SERVICES If your project requires connection to public facilities, you must submit a"will-serve" letter from the <br /> appropriate water, sewer or drainage entities at the time of filing. This letter must include a statement <br /> from the agency that they will serve the proposed development, and have,or will have,the capacity to <br /> provide such service. <br /> • GEOTECHNICAL A preliminary geotechnical report, prepared by a State-registered geotechnical engineer or State- <br /> REPORT registered geologist and based upon adequate test borings. <br /> • CONTAMINATION A surface and subsurface contamination report shall be required at the time of the tentative map <br /> REPORT submittal (Development Title Section 9-905.12). Submit this study to the Environmental Health Division <br /> Prior to submitting this application. <br /> • PARCEL MAP If you believe the proposed division qualifies for a parcel map waiver, include a waiver request with the <br /> WAIVER application. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The applicant will <br /> COMPLETE be sent a postcard once the application has been determined complete. (Your application cannot be <br /> processed until it is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no <br /> adverse effects,the application will be processed. If there are potential adverse effects,further <br /> environmental review will be required. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property <br /> AND ACTION owners affected by your proposal. At the end of a review and comment period a staff report will be <br /> prepared and the Planning Commission will hold a public hearing. If the Commission can make the <br /> required findings,the application will be approved. Typically action will be taken by the Commission <br /> within 8 weeks after application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action <br /> is final unless appealed. For further information on the length of the appeal period,contact the staff. <br /> F.v WA IOP SI IRM\/IRInN(p— 19-nQ-nA1 PAnP 1 of.c) <br />