Laserfiche WebLink
a ?� THOMAS R. FLINN P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> b • <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> i (209)468-3000 FAX(209)468-2999 <br /> www.sjgov.org/pubworks <br /> THOMAS M. GAU <br /> CHIEF DEPUTY DIRECTOR U' <br /> MANUEL SOLORIO wory�g for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> February 22, 2008 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Patrick Crosby <br /> FROM: Dean Gilman, Engineer IV <br /> Public Services Division <br /> SUBJECT: PA-08-27 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE AN EXISTING 260 <br /> ACRE PARCEL INTO THREE PARCELS. PARCEL ONE,TWO,AND THREE EACH TO <br /> CONTAIN 86.90 ACRES, LOCATED AT THE SOUTHEAST CORNER OF CARLIN <br /> ROAD AND ROBERTS ROAD. (SUPERVISORIAL DISTRICT 3) <br /> PROPERTY OWNER: Sarale, James Etal APPLICANT: Quartaroli & Associates, Inc. <br /> ADDRESS: 11981 S. Roberts Road APN: 191-150-03 <br /> INFORMATION: <br /> The site is currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> The 100-year Flood Elevation will be approximately 7-feet NGVD. The portion of the site from the riverside <br /> toe of levee extending water ward has a 100-year Flood Elevation of 19-feet to 20-feet NGVD. <br /> Roberts Road has an existing right-of-way width of 60-feet and a planned right-of-way width of 60-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is <br /> due and payable at the time of building permit application. <br />