Laserfiche WebLink
Apr--10-01 01 : 18P P.05 <br /> SA-01-23 <br /> Page 2 of 2 <br /> D_ Applicant shall prepare a detailed schematic showing all milking equipment(tank, <br /> pipeline,etc...)in milk-barn and milk-house prior to final occupancy approval by <br /> Environmental Health Division. A plan review fee of 5174 shall accompany these <br /> plans per Board of Supervisors 90-620. <br /> E. All liquid and solid dairy wastei from this operation are to be retained on the <br /> premises so as not to cause a nuisance or a health problem (porter-Cologne Water <br /> Quality Control Act,Chapter 4, Article 4, Section 13260-13263)- <br /> F. All liquid and solid dairy wastes and vector problems associated with this dairy <br /> operation are to be retained on the premises so as not to cause a nuisance or a health <br /> problem(Porter-Cologne Water Quality Control Act,Chapter 4, Article 4, Section <br /> 1326043263). Any complaints that are verified against this site will be charged the <br /> Environmental Health Division hourly rate of$87.00 for response and correction as <br /> per Board of Supervisors Resolution B-92-1591, <br /> G. Open,pump, and backfill the septic tank, seepage pit or excavation }or the milk-bam <br /> septic system under permit and inspection by the Environmental IIealth Division. <br /> (San Joaquin County Development Title, Section 9-1110.3 &9-1110.4). <br /> H. Construction of individual sewage disposal systcm(s) for the milk-barn septic system <br /> under permit and inspection by the Environmental Health Division is required at the <br /> time of development(San Joaquin County Development Title, Section 9-1110.3 &9- <br /> 1110.4). <br />