Facts in Support of Findings J <br /> Potential impacts to special-status wildlife species will be less than significant with implementation of <br /> Mitigation Measures BIO-la, BIO-lb, BIO-lc and BIO-ld, which require Swainson's Hawk-specific <br /> avoidance measures, western burrowing owl-specific avoidance measures, seasonal work limits and pre- <br /> construction surveys to avoid impacts to protected breeding birds and bat-specific avoidance measures. The <br /> applicant must also mitigate for the loss of foraging habitat through the provision of Habitat Management <br /> lands or through participation in the San Joaquin County Multi-Species Habitat Conservation and Open Space <br /> Plan ("SJMSCP'D. Implementation of Mitigation Measure BIO-2, requiring a wetlands delineation, if not <br /> already completed, verification of the delineation by the Army Corps of Engineers (ACOE), authorization of <br /> any fill of wetlands and/or waters of the U.S./State, and mitigation compensation, will reduce impacts to <br /> wetlands and/or waters of the U.S./State to less than significant Implementation of Mitigation Measure <br /> BIO-3,which in turn requires the implementation of Mitigation Measures BIO-la, BIO-Ib,BIO-lc,BIO-ld <br /> and BIO-2 would ensure that the project's contribution to cumulative biological resource impacts would be <br /> less than significant. <br /> 4.1.5 Cultural Resources <br /> Summary of Potential Impacts <br /> An evaluation of potential impacts on archaeological and human remains and paleontological resources is <br /> found in Section 4.7 (Cultural Resources)of the Draft EIR. <br /> Neither the archival research nor the cultural resources survey resulted in the identification of recorded or <br /> unrecorded prehistoric or historic-era archaeological resources within the project site or a 0.5 mile buffer of <br /> the project site. Buried archaeological resources do not always manifest themselves on the surface,as much of <br /> the archaeological record for the region has likely been buried beneath the vast alluvial deposits by erosion and <br /> depositional processes prevalent in the valley, especially over the last 9,000 years. Additional archaeological <br /> material could be buried beneath the fill and pavement of the existing UP Intermodal Facility or below the <br /> plow zone in the agricultural fields. Consequently, archaeological materials could be revealed unexpectedly <br /> during project construction. It does not appear that the project site contains human remains as there are no <br /> known historic cemeteries or prehistoric burial grounds in the vicinity; however, this possibility cannot be <br /> entirely discounted as remains interred outside of a formal burial area could be present. There would be <br /> minimal excavation(less than 5 acres) associated with the project Excavation is expected to range from 6 to 8 <br /> feet below the ground surface in limited areas. Excavations would encounter the Pleistocene Modesto <br /> Formation,which may contain paleontological resources. Pleistocene remains are uncommon in San Joaquin <br /> County — in fact, only 29 specimens have been recovered, accounting for less than four percent of all <br /> paleontological resources in the County. Because excavation for the project would be limited and because <br /> there are very few Pleistocene-aged paleontological resources present, the likelihood of encountering <br /> paleontological resources is very low. However unlikely, disturbance or destruction of a paleontological <br /> resource could still occur and therefore represents a potentially significant impact. Project-related impacts <br /> c ould also be cumulatively considerable when combined with other projects in the region. <br /> Findings <br /> The County finds that, pursuant to Section 15091(a)(1) of the CEQA Guidelines, changes or alterations <br /> have been required in or incorporated into the project, which mitigate or avoid the potential impacts on <br /> archaeological and paleontological resources and human remains as identified in the Final EIR. The County <br /> further finds that the change or alteration in the project or the requirement to impose the mitigation as a <br /> condition of project approval is within the jurisdiction of the County to require, and that this mitigation is <br /> appropriate and feasible. <br /> November 2012 9 Findings of Fact/ <br /> Statement of Overriding Considerations <br />