My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Several stated Project Objectives will also provide benefits to the immediate community and to San <br /> Joaquin County,including: <br /> o To expand capacity in order to meet the projected,growing demand for rail transport within the <br /> region by 2013 through 2035; <br /> o To provide local and area shippers and receivers of goods with increased opportunities for transport <br /> via rail as an alternative to long-haul shipment by truck on the regional highway network; <br /> o To provide additional capacity for rail transport within an established,regionally-significant area in <br /> dose proximity to two major highways (I-5 acid SR 99) and the Union Pacific's O and and Fresno <br /> Subdivisions (which are connected to Union Pacific's national network),and adjacent to or near <br /> light industrial,rural and other complementary,non-residential uses. <br /> o To increase capacity by enabling the facility to handle longer uninterrupted lengths of rail cars, <br /> allowing more rail cars to be loaded and unloaded in one sequence while reducing crossings over the <br /> local roadway network <br /> o To streamline and facilitate on site traffic,cargo movements and traffic accessing the facility with a <br /> more efficient layout and design; <br /> o To reduce truck processing and idling time at the facility truck entrance,while providing stringent <br /> cargo security. <br /> • Based upon an economic study prepared the Business Forecasting Center,Eberhardt School of <br /> Business,for the University of the Pacific dated August 17,2010,Analyrzr of Economic,Empkyment and <br /> Tax Revenue Impacts.2011-2025(the"UOP Study's the project will generate several substantial economic <br /> benefits to San Joaquin County. <br /> o The project will generate$142 million in economic output to San Joaquin County,including revenue <br /> and sales attributable to the facility construction and operation. <br /> o The project will generate$140 million in total additional income for direct and indirect employees. <br /> o The project will generate an additional$43 million in additional tax revenue,including federal,State <br /> and Iocal taxes. <br /> o During the three years of initialroject development and construction,the pro ect is expected to <br /> average direct employment of 2V individuals.A further 59 indirect jobs and 8�induced jobs is <br /> expected,leading to a total annual average of 385 jobs during the fust phase of the project's facilities <br /> development and the creation of 623 jobs over the life of the project <br /> o The total,cumulative economic impact of construction and the additional operations associated with <br /> the project during a fifteen year period from the start of construction is expected to be$411.9 <br /> million. Total income effects from the project between are estimated to be$140.2 million during <br /> this period. <br /> • Theprlect is in an ideal location for regional, national,and international multi-modal movement of <br /> Ys Within one hundred miles of the project site,there are thirty California counties with a <br /> combined population of 12.9 million people and a gross regional product of$739 billion in 2008.This <br /> region contains a diverse concentration of agricultural producers,retailers,manufacturers and <br /> distributors. <br /> • The current Union Pacific Intermodal Facility is served directly by UP main lines that reach northward <br /> and southward along the Pacific Coast,and eastward into the Central United States.The regional <br /> logistics and transport infrastructure is also complemented by another major rail carrier in San Joaquin <br /> County.Therefore,the project plays a critical support role in the regional rail system and expands the <br /> market reach of shippers m the region and throughout the United States. <br /> • Theproposed modernization and expansion of the Intermodal Facility will contribute to both <br /> development and productivity of San Joaquin County's transportation sector. UP's$248 million <br /> November 2012 35 Findings of Fact/ <br /> Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.