Laserfiche WebLink
o Promote Intera=gy Coordination. Public Participation and Citizen Involvement: Expansion <br /> will develop the County's transportation cluster thereby improving engagement throughout a <br /> cross-section of society <br /> o Improve Quaky of Life:The project will reduce transportation costs and create opportunities <br /> to improve supply chain management, which can lower consumer costs and increase <br /> productivity <br /> o Improve Goods Movement. The terminal modernization and expansion will improve goods <br /> movement by developing the county's intermodal system and attracting addition distribution <br /> centers <br /> o Improve Mobility and Accessibility:Modernization and expansion will double capacity thereby <br /> enhancing ability to move goods to market quickly and at higher-value <br /> o Enhance the Environment: The project will reduce air emissions by increasing the use of <br /> lower emission rail transportation and by decreasing highway congestion as it lowers long-haul <br /> truck miles <br /> o Maximizing Cost Effectiveness: Modernization and expansion will enhance and preserve <br /> existing transportation options for users of the County's transportation infrastructure <br /> • The Union Pacific Modernization and Expansion Project, when compared to the other alternatives <br /> analyzed in the Final FIR (including the No Project Alternative), provides that best available balance <br /> between maximizir+g the attainment of the Project Objectives while minimi ing significant <br /> environmental impacts. <br /> Considering all factors, the County finds that each of the above-referenced overriding considerations <br /> constitutes a separate and independent ground for finding that the project benefits outweigh its significant <br /> adverse environmental impacts and, alone, is an adequate overriding consideration associated with the <br /> project that outweigh the project's significant and unavoidable impacts and are, therefore, considered <br /> acceptable,warranting approval of the project. <br /> J <br /> November 2012 37 Findings of Fact/ <br /> Statement of Overriding Considerations <br />