Laserfiche WebLink
Responsible <br /> Significant <br /> Measures and Statements of Findings of Impacts Being Monitoring/lny/ Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing <br /> Mitigation Responsibility Timing <br /> location that would aid In meeting the following performance standards: <br /> 1. Restored/created wetlands shall remain Inundated or saturated for sufficient <br /> duration to support a predominance of hydrophytic vegetation. <br /> 2. Restored/created wetlands shall exhibit plant species richness and cover <br /> comparable to existing wetlands(excluding non-native and/or weedy plant <br /> species). <br /> 3. Restored/created wetlands shall replace the lost wetlands at a minimum <br /> ratio of one acre created for each acre,or fraction thereof,permanently <br /> Impacted. <br /> 4. The applicant shall provide for the protection of the mitigation areas in <br /> perpetuity,either through deed restrictions or conservation easements. <br /> 4.6 Biological Resources(cont) <br /> 5. The applicant shall establish a five-year program to monitor the progress of <br /> the wetland mitigation toward these standards.At the end of each <br /> monitoring year,an annual report shall be submitted to the City,the <br /> RWQCB,and the USACE.This report.shall document the hydrological and <br /> vegetative condition of the mitigation wetlands,and shall recommend <br /> remedial measures as necessary to correct deficiencies. <br /> Less than significant Impact after implementation of Mitigation Measure <br /> BIO-2. <br /> 810-3:Project Specific Measures.The project applicant shall implement See BIO-1a through BIO-1d See BIO-1a through BIO-td See BIO-1a through BIO-td See BIO-1 a through BIO-1d <br /> Measures BIO-1a through BIO-1d,and BIO-2.These measures would ensure and BIO-2 and BIO-2 and BIO-2 and BIO-2 <br /> that the project's contribution to cumulative biological resource impacts would <br /> be less than significant. <br /> 4.7 Cultural Resources <br /> CULTURAL-1:The applicant and/or project contractors shall halt work If Verification by County,as Union Pacific and Quallfied archaeologist and During ground disturbing <br /> archaeological resources are discovered during ground-disturbing activities.If needed construction contractors Native American activities <br /> cultural resources are encountered,all activity In the vicinity of the find shall representative,with <br /> cease until the resources can be evaluated by a qualified archaeologist and a verification provided to San <br /> Native American representative.Prehistoric archaeological materials might Joaquin County Community <br /> Include obsidian and chert flaked-stone tools(e.g.,projectile points,knives, Development Department <br /> scrapers)or toolmaking debris;culturally darkened sell("midden")containing as applicable <br /> heat-affected rocks,artifacts,or shellfish remains;and stone milling equipment <br /> (e.g.,mortars,pestles,handstones,or milling slabs);and battered stone tools, <br /> such as hammerstones and pitted stones.Historio-period materials might <br /> include stone,concrete,or adobe footings and walls;filled wells or privies;and <br /> deposits of metal,glass,and/or ceramic refuse.If the archaeologist and Native <br /> American representative determine that the resources may be significant,they <br /> shall notify Union Pacific and shall develop an appropriate treatment plan for <br /> the resources.The archaeologist shall consult with Native American <br /> representatives In determining appropriate treatment for prehistoric or Native <br /> American cultural resources.Contract specifications shall address these <br /> requirements.In considering any suggested mitigation proposed by the <br />