My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Mitigation Monitoring/Reporting <br /> Reporting in Actlon Party for Providing Responsibility riming <br /> and Unavoidable p I <br /> 42;Transporfatfon <br /> TRANS 1: Prior to the issuance of building permits for Phase I of the project, Verification by County. Union Pacific San Joaquin County Prior to Issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase I <br /> signal at the intersection of Lathrop Road and 1-5 Southbound Ramps,which Department and Public <br /> Improvement is programmed for inclusion and construction under the RTIF Works Department <br /> program,by paying the applicable fees for the project under the San Joaquin <br /> Regional Transportation Impact Fee(RTIF)program at the time building <br /> permits are applied for.Construction of this improvement would improve the <br /> intersection LOS to an acceptable LOS C or better.Because San Joaquin <br /> County,as Lead Agency,does not have jurisdiction over this improvement and <br /> it is uncertain whether full funding will be achieved for construction of this <br /> improvement,this impact is significant and unavoidable. <br /> TRANS-2:Prior to the issuance of building permits for Phase I of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase I <br /> signal at the intersection of Lathrop Road and 1-5 Northbound Ramps,which Department and Public <br /> improvements are programmed for inclusion and construction under the RTIF Works Department <br /> program,by paying the applicable fees for the project under the RTIF program <br /> at the time of building permit applications.Construction of this improvement <br /> would improve the Intersection LOS to an acceptable LOS C or better. <br /> Because San Joaquin County,as Lead Agency,does not have jurisdiction over <br /> this improvement and it is uncertain whether full funding will be achieved for <br /> construction of this improvement,this impact is significant and unavoidable. <br /> TRANS-3:There is no feasible measure to mitigate the impact.Installation of a N/A NIA N/A N/A <br /> traffic signal would mitigate the impact to a less-than-significant level,but <br /> Caltrans would not install a traffic signal because the Peak Hour Signal <br /> Warrants would not be met.Therefore,this is a significant and unavoidable <br /> Impact. <br /> TRANS-4:Prior to the issuance of building permits,the project sponsor shall Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> contribute its fair share of the cost of the addition of a lane to the southbound Community Development permits for Phase i <br /> SR 99 freeway segment between French Camp Road and Lathrop Road, Department and Public <br /> which improvement is programmed for inclusion and construction under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> program at the time of building permit applications. Construction of this <br /> improvement would improve diverge operation LOS to an acceptable LOS D or <br /> better.Because San Joaquin County,as Lead Agency,does not have <br /> jurisdiction over this Improvement and it is uncertain whether full funding will be <br /> achieved for construction of this improvement,this impact is significant and <br /> unavoidable. <br /> 2 Trahspo tion and T(afftc(cont <br /> r <br /> TRANS-5: Prior to the issuance of building permits for Phase I of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of implementing Community Development permits for Phase I <br /> Mitigation Measure TRANS-4 contribute fair share cost of addition of a lane to Department and Public _ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.