Laserfiche WebLink
Corinne E. King -2- <br /> Community Development Department <br /> PA-1300007(SA) <br /> built in the future at the UPRR crossing. The developer shall deposit funds with the County for all <br /> costs,as estimated by Public Works Transportation Engineering Division,prior to Public Works <br /> preparing or contracting for the required study. (Development Title Section 9-1150.4) <br /> Upon satisfaction of the above requirement,the following Conditions of Approval shall apply. Additional and/or <br /> revised Conditions of Approval may be necessary based upon the completed application. <br /> RECOMMENDATIONS: <br /> 1. All applicable City of Lathrop Conditions of Approval including but not limited to improvements and right-of- <br /> way dedications for Roth Road, shall be satisfied prior to issuance of building permit for each phase of the <br /> project. Written verification including a copy of the approved encroachment permit from the City of Lathrop <br /> shall be provided to Public Works. <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application for each phase of the project. The fee shall be automatically adjusted July <br /> I of each year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00433) <br /> 3. The Regional Transportation Impact Fee shall be requi to is development. The fee is due and payable at <br /> the time of building permit application for each phas f pro ct. The fee will be based•on the current <br /> schedule at the time of payment. (Re <br /> 4. The Water Supply Facilities Impact a required for this development. The fee is due and <br /> payable prior to issuance of the builphase of the project. The fee shall be automatically <br /> increased on January I of each yea5 at the rate of 4.55 percent. The fee will be based on <br /> the current schedule at the time of pnt Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit for each phase of the <br /> project. <br /> 6. Verification shall be obtained from the Public Works Solid Waste Division(468-3066)that this development <br /> has met the requirements of the Waste Plan Format for Development Projects for each phase of the project. <br /> Final Site Plan is required upon submittal of verification. <br /> 7. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties and to prevent offsite sediment transport. Retention basins shall be fenced with six(6)foot <br /> high chain link fence or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval,prior to release <br /> of building permit for Phase 1 of the project. (Development Title Section 9-1135) <br /> 8. Applicant shall file `Permit Registration Documents' (PRD)with the State Water Resources Control Board <br /> (SWRCB),and submit the `Waste Discharge Identification Number(WDID)issued by SWRCB to the <br /> Department of Public Works.Applicant shall also comply with run-off reduction requirements as detailed in <br />