Laserfiche WebLink
.*SAN SAN JOAQUIN COUNTY <br /> ''�'' 'Oi DEPARTMENT OF PLANNING AND BUILDING INSPECTION <br /> A <br /> �: < <br /> _ <br /> CHET OAVISSON <br /> 1810 E. HAZELTON AVE.. STOCKTON, CA 95205 ww. <br /> •r... '�' PLANNING PHONE: 209/468-3120 <br /> <crsc�"� BUILDING PHONE: 209/466.3123 JERRY MERZICK <br /> NEIGHBORHOOD PRESERVATION PHONE: 209/468-3021 onni ww. <br /> RENE JACKSON <br /> Ueoni Unne <br /> TOM WALKER <br /> D.ONI Mr.no <br /> August 7 , 1989 <br /> Brian Cox <br /> City of Riverbank <br /> 6707 Third Street <br /> Riverbank, CA 95367 <br /> Dear Mr. Cox: <br /> RE : INITIATION OF ENVIRONMENTAL IMPACT REPORT <br /> ON USE PERMIT APPLICATION NO . UP-89-30 <br /> After completion of the Initial Study for the above-referenced <br /> project, it has been determined that an Environmental Impact <br /> Report (EIR) will be required to address potentially significant <br /> environmental impacts which may result from the envisioned build- <br /> out of the project site. The report will be primarily focused on <br /> ( 1 ) loss of riparian habitat and native vegetation, ( 2 ) traffic, <br /> ( 3 ) conflict with General Plan policies , ( 4 ) access to Stanislaus <br /> River, and ( 5 ) growth inducement. <br /> In order to proceed with the preparation of an EIR on your Use <br /> Permit request, an initial fee of $2 , 000 is required in order to <br /> prepare the Notice of Preparation (NOP ) and the Request for <br /> Proposal (RFP ) . you will also be responsible for the costs of <br /> preparing the EIR. <br /> The purpose of the NOP is to provide a 30-day notice and oppor- <br /> ta,-ity to comment for public agencies and private organizations <br /> as to the scope and content of the EIR. During the NOP comment <br /> period, Planning staff will circulate a RFP to environmental con- <br /> sulting firms in order to select a consultant to prepare the EIR. <br /> If you wish to have a particular consulting firm included in the <br /> RFP distribution list, please have them submit their qualifica- <br /> tions material to the Planning Division as soon as possible . <br /> Once the consultant is selected by the County, you will be <br /> required to submit a second fee to cover the cost of the EIR <br /> preparation. Once that is accomplished, the County will enter <br /> into an EIR Agreement with the consultant, and preparation of the <br /> EIR will begin. <br />