Laserfiche WebLink
Yes No <br /> b. Will the project impact any rare, <br /> endangered, or recreational species <br /> — <br /> located on or near the site? <br /> 4 . Air : <br /> will the project result in deterioration of <br /> existing air quality , including creation of <br /> objectionable odors; will future project <br /> residents be subjected to significant X <br /> pollution levels? <br /> 5 . Noise: <br /> a . Will the project expose people to high X _ <br /> noise or vibration levels? <br /> b. Will the project result in increased <br /> noise or vibration levels? <br /> 6 . EnergnNatural Resources/Hazards ( consider <br /> the General Plan ) : <br /> a . Will the project result in any signifi- <br /> cant consumption of energy? <br /> b. Will the project affect the potential <br /> use, extraction, conservation, or <br /> depletion of a natural resource other <br /> than agricultural land? <br /> c. Will the project create a risk of <br /> explosion, release or exposure to <br /> hazardous substances , or other <br /> dangers to public health and safety? <br /> 7 . Utilities and Public Service: <br /> *a . Will the project require alteration of , <br /> addition to , or the need for utility <br /> systems - water , sewer , drainage, solid <br /> waste - including sphere of influence or �— <br /> district boundary change? <br /> *b. will the project result in the need for <br /> or the expansion of the following services : <br /> fire and police protection, schools , parks <br /> and recreation, roads , flood control or <br /> other public works facilities , public <br /> transit , or governmental services? <br /> *"Yes" answers to these questions will require additional discussion, <br /> but do not necessarily indicate a potentially significant impact. <br /> - .� - rr-RR1 <br />