Laserfiche WebLink
WORK SITE PLAN B: GENERAL CONDITIONS <br /> Methyl Bromide Methyl Bromide Limits <br /> Commodity Fumigation Special Site Requirements <br /> if any of the questions in Section B are answered ;Q, mitigation measures or alternative <br /> conditions must be identified at the end of Section B. Consult with the County Agricultural <br /> Commissioner for suggestions on alternative conditions. <br /> B.1: Maximum (Condition 1). Will your application rate be 8 <br /> Application pounds per 1000 cubic feet or less? YES NO <br /> Rate <br /> If question B.1 is answered NO, you must <br /> complete Section E. <br /> B.2: Total Methyl (Condition 2). Will you be using 1000 pounds <br /> Bromide or less of methyl bromide at the work site Y=S NO <br /> during a 24 hour period? <br /> If question B.2 is answered NO, you must <br /> complete Section E. <br /> B.3: Other Types (Condition 3). Can you insure that no other <br /> of Applications types of fumigations (e.g. field, greenhouse, YES NO <br /> potting soil, structural) will be done at the work <br /> site at the same time as a commodity <br /> fumigation? <br /> B.4: Enclosed (Condition 4). Is the fumigation enclosure <br /> Areas outside of other buildings (i.e. not within a YES NO <br /> secondary enclosed area)? <br /> B.5: Common (Condition 4). Is the fumigation enclosure-- <br /> Walls physically separated from all other structures YES NO <br /> (i.e. the fumigation enclosure does not share a <br /> common wall with another building)? <br /> 8/8/94 <br />