Laserfiche WebLink
S Sufficient W*MW s. 4/ <br /> I = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map showing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ❑ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> ❑ 6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presdak minimum 12 inches) �� -r '{m <br /> ❑ 6.4 Description of the date, time and condition of the test hole after the 24-hour soak penod (hole still intact,hole dry, <br /> depth to water remaining in hole, etc.) <br /> -� <br /> ❑ 6.5 The test conformed to SJC Policy EHD 02-02 (correct depth, 2" gravel, 6"water refill, correct readings <br /> recorded). / /P / /��io, � -W-5--, , -< <br /> ❑ 6. Complete Percolation Test Formncluding readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Lisa Medina, Sr. R.E.H.S. Reviewed Date: <br /> r �Y <br /> 41 ? <br /> y �y � v <br /> / <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />