My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008748
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
8606
>
2600 - Land Use Program
>
PA-1100074
>
SU0008748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:39 AM
Creation date
9/9/2019 10:11:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008748
PE
2631
FACILITY_NAME
PA-1100074
STREET_NUMBER
8606
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25203001
ENTERED_DATE
5/11/2011 12:00:00 AM
SITE_LOCATION
8606 W SCHULTE RD
RECEIVED_DATE
5/9/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SCHULTE\8606\PA-1100074\SU0008748\APPL.PDF \MIGRATIONS\S\SCHULTE\8606\PA-1100074\SU0008748\CDD OK.PDF \MIGRATIONS\S\SCHULTE\8606\PA-1100074\SU0008748\EH COND.PDF \MIGRATIONS\S\SCHULTE\8606\PA-1100074\SU0008748\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1100074 <br /> Jose Alvarez <br /> Site Approval Application No. PA-1100074 was approved by the San Joaquin County Community <br /> Development Department on July 18, 2011. The effective date of approval is July 28, 2011. This <br /> approval will expire on January 26, 2013, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, [209]468-3154) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application. A fee <br /> is required for the Site Plan review. (Development Title Section 9-884) <br /> b) APPROVED USE: This approval is for 100-foot high communications monopole and related <br /> equipment as shown on the Site Plan dated April 28, 2011. <br /> c) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d) SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4[d]) <br /> e) MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecommunication facility and, whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> f) REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six (6) consecutive months. Removal and site restoration shall be completed within ninety <br /> (90)days of the end of said six(6)month period. (Development Title Section 9-1065.8) <br /> g) TOWER LIGHTS: For safety purposes, the communications tower shall be lighted according to the <br /> following: <br /> A <br /> Conditions of Approval - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.