Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue . Stockun CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species HaMtat Conservation fr Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Stephanie Stowers,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: May 2,2017 <br /> Local Jurisdiction Project Title: PA-1700077(SA) <br /> Assessor Parcel Number(s): 143-260-15,-16 <br /> Local Jurisdiction Project Number: PA-1700077(SA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Urban Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Stowers: <br /> SJCOG, Inc. has reviewed the application referral for PA-1700077 (SA). This project consists of a Site Approval <br /> application for a wholesale lumber yard that includes the construction of a rail spur and four buildings totaling 55,200 <br /> square feet. Building One to contain a 30,000 square foot warehouse and office building. Building Two, Three, and Four <br /> each to contain 8,400 square feet and to be used as storage sheds. The project site is located on the east side of the <br /> north terminus of North Shaw Road, 3,000 feet north of East Fremont Street, Stockton (APN/Address: 143-260-15, -16; <br /> 1648 N. Shaw Road, Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. t>ttp://w .sicoci.orci <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no Iffier than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the rfMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the 1TMM& <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation casements or fee title;or <br />