Laserfiche WebLink
APPLICATION - AGRICULTURAL EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> OPERATION CHARACTERISTICS <br /> (USE ADDITIONAL PAPER,IF NECESSA" <br /> Describe any processing to be done on-site: Organic and chemical fertilizeL._mny h ri <br /> added to excavation material before sale. <br /> List type of equipment or machinery used in the project and method of evacuation: Truck and w h e r 1 1 on d e r s <br /> scrapers, bottom and end dump trucks <br /> Describe any trees or vegetation to be removed: Existingwalnut trees to a distance of <br /> 100 - 150 feet from river will be removed and then replanted after <br /> completion of project. <br /> List any noxious weeds on the site: None <br /> Describe all hazardous materials used or stored on-site: Diesel fuel. and lubricating oil <br /> RECLAMATION PLAN <br /> Proposed final use of the site(crops,Irrigation methods,etc.): Sprinkler irrigated walnut <br /> orchard (possible "quiet" park setting for family and certain <br /> organized special interest groups) . <br /> WIII the topsoil be replaced? p Yes ❑No (if no,attach a lolls report) <br /> Describe any changes In Irrigation systems: N o n e <br /> Describe measures to stabilize slopes: The 40 - 60 F t . vertical slopes will be <br /> excavated to create a 2 Ft. horizontal to 1 Ft. vertical slope . <br /> *See Attached. <br /> Describe measures to prevent soil erosion: The existingvertical bank will be <br /> excavated to create a flat area next to the river with a gradual <br /> slope 40 - 60 Ft. away from the river. <br /> Describe measures to prevent water pollution(if adjacent to waterway): Excavation material will <br /> be pulled nway from river <br /> Describe measures to protect fish,wildlife and vegetation: Total compliance with stream b e d <br /> alteration Permit li II-473-94 <br /> -4- <br />