Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENT <br /> SA-00-12 <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development <br /> if building is provided water supply. The fee is due and payable prior to issuance of the <br /> building permit. The fee currently is $423.00 per 1,000 gross square foot of building as <br /> Service Commercial. The fee shall be automatically increased on January 1 of each <br /> year through the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can <br /> be verified that the existing development on this site was in operation on or after <br /> April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. A Final Site Plan will be required upon submittal of verification. <br /> GK:BN:mr <br /> PS-OEO 7 M4 <br /> E: Manuel Lopez, Director of Public Works <br />