Laserfiche WebLink
APPLICATION- GRADING EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> RES';:'::'::::>;: : > :' `';;>:<` ` ......"<.:; :. <br /> ::.. ...>:.:::;:... .: <br /> ;::. <br /> ......>:: :,.,. BU.ILDINGS;AND STR.T,C.TU. <br /> be shown <br /> a#'the Sits <br /> .:: <br /> (Chia#niortnaticsn they P#anj <br /> Structure NumberProposed Use" Ground Floor Area Highest Floor Overall Height(in <br /> feet) <br /> The'structure number'should be used in identifying the structure on the Site Pian. <br /> *• If there are two or more proposed uses in a building, make separate listings for each use. For residential buildings, state <br /> the number of units in each structure. <br /> hstid W <br /> :: ..:..:... <br /> .... .:...::::::::............. <br /> Public Water Service Provider Annex-Formation Distance to Public <br /> Proposed❑ Required Water (Feet) <br /> Existing❑ � <br /> Private Water, Existing Well New Well ❑ Well Replacement ❑ <br /> . <br /> sewage Disposal:; <br /> Public Sewage Service Provider Annex-Formation Distance to Public <br /> Disposal Required Sewer Facility <br /> Proposed❑ ^� _ <br /> Existing❑ <br /> On-site Sea Existing Septic System New Septic System ❑ Other ❑ <br /> Disposalwa <br /> Storm Drainage <br /> Public Storm Service Provider(if Public) Annex-Formation Terminal Drainage Detention- <br /> Drainage Required to: Retention Ponds <br /> Proposed❑ _ <br /> Existing❑ <br /> Private Storm On-site Retention Pond(s) ❑ Natural Drainage/No Change Other ❑ <br /> Drainage <br /> ;: ;' £xistlnq Roa <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> J t7L t s�J '4- j ' ' Yes❑ Nov Yes❑ No <br /> 14 <br /> !� Yes❑ No❑ Yes❑ No❑ <br /> Yes❑ No❑ Yes❑ No❑ <br /> > Ext:aVation Characteristics <br /> Excavation Area (Acres): Fill Area (Acres). v <br /> Existing Site Elevation (Average at 100' Intervals): 'c) J <br /> Proposed Site Elevation (Average at 100' Intervals): 15 7. L� <br /> Perimeter Elevation (Average at 100'Intervals, 5'from Property Line): -7• 3Cj <br /> Perimeter Elevation (Average at 100' Intervals, 100'from Property Line): ' <br /> Amount of Material to be Removed (Cubic Yards): 0 ' Y. <br /> Approximate Start Date: f s 9 Z Approximate End Date: /S 97. <br /> Hours of Operation: �j,�}/t7 (�•- p Average Daily Truck Trips: G <br /> -3- <br />