Laserfiche WebLink
Kerry Sullivan 2 <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200148 <br /> 3. Drainage from each Parcel shall be retained on-site by a retention basin (18-inch maximum <br /> depth) and shall be noticed by a statement on the Parcel Map. The volume of on-site drainage <br /> required shall be specified for each parcel on the Parcel Map. <br /> (Development Title Section 9-1135.9) <br /> BEN:sh <br />