L June 4, 2004 <br /> NOA Project Number: E04065A <br /> L <br /> Table 5. <br /> LSummary of Percolation Tests. <br /> Test No., Percolation Percolation Rate Test Comment <br /> Date Tested Test Depth(ft) (minutes/inch) Duration <br /> P-1 shallow,6-2-04 3.26 — 5 hr No movement,failed. <br /> (Parcel 1) <br /> P-1 deep,6-2-04 19.79 8.1 5 hr Achieved satisfactory <br /> (Parcel 1) percolation rate. <br /> P-2 shallow,6-2-04 3.0 250 5 hr Failed. <br /> (Parcel 2) <br /> P-2 deep,6-2-04 24.65 15.6 5 hr Achieved satisfactory <br /> _ (Parcel 2 percolation rate. <br /> Notes: A satisfactory percolation rate for a"shallow"test is less than or equal to 60 minutes per inch. <br /> kA satisfactory percolation rate for a"deep"test is less than or equal to 30 minutes per inch. <br /> 6.5 Discussion of Percolation Tests <br /> As a result of the percolation testing, both parcels evaluated demonstrated a satisfactory <br /> Lpercolation rate in accordance with the requirements of the EHD. <br /> The Site appears to be suitable for leach line and seepage pits. We recommend that any future <br /> septic system layout follow the method prescribed in the Sewage Standards (1996) of the <br /> EHD. We do not foresee any adverse conditions. <br /> 7.0 CONCLUSIONS AND RECOMMENDATIONS <br /> L In summary, a satisfactory percolation rate was achieved in the proposed septic disposal areas <br /> of both phases of the project. No ground water was encountered in any of the borings drilled <br /> L on the property, and the depth to ground water is approximately 110 to 135 feet below the <br /> ground surface for the period of Fall 1998 and Spring 1999. The on-site water well was tested <br /> for nitrate and DBCP. DBCP was non-detectable, and nitrate was found at 10.0 mg/L-NO31 <br /> well below the maximum contaminant limit of 45 mg/L-NO3. <br /> Based on the results of this study, our office has found the soils to be suitable for a standard <br /> septic system with leach lines and seepage pits for the Site. We recommend that the design <br /> Land installation of the septic system follow the requirements established by the EHD. <br /> 10 f <br /> L <br /> L <br />