Laserfiche WebLink
California- Regional Water Quality Co- `rol Board <br /> Central Valley Region <br /> Karl E. Longley,ScD,P.E.,Chair <br /> Linda Adams Sacramento Main Office Arnold <br /> Secretarylor 11020 Sun Center Drive 9200,Rancho Cordova.Cal ifomia 95670-6114 Schwarzenegger <br /> Environmental Phone(916)464-3291 •PAX(916)464-4645 Governor <br /> Protection hopJ/www.waterboards.ca.gov/centralvalley <br /> DDIIEDFD <br /> 30 March 2007 APR - 2 2007 <br /> ENVIROiNIvTNT HEALTH <br /> PERN?IT/SERVICES <br /> Kevin Swanson <br /> San Joaquin County Comm. Develop. Dept. <br /> 1810 E. Hazelton Ave. <br /> Stockton, CA 95205 <br /> SCH NO. 2007022108, NEGATIVE DECLARATION, RECREATION CAMPGROUND, <br /> STOCKTON, SAN JOAQUIN COUNTY 5pab <br /> I have reviewed the Negative Declaration for construction of a recreational campground <br /> and recreation vehicle park, office building/recreation building, reception hall, manager's <br /> building, restroom/shower buildings, and picnic area. The project will be located at the <br /> intersection of Woodbridge Avenue and State Highway 99. The State Clearinghouse <br /> Number is 2007022108. <br /> Waste Discharge Requirements <br /> Because wastewater will be generated, stored, or disposed on-site, WDRs may be <br /> required. In accordance with California Water Code Section 13260, the project <br /> proponent is required to submit a Report of Waste Discharge (RWD) at least 150 days <br /> prior to discharging wastewater at the site. <br /> Construction Stormwater Permit <br /> A National Pollutant Discharge Elimination System (NPDES) General Permit for Storm <br /> Water Discharges Associated with Construction Activities, Order No. 99-28-DWQ is <br /> required when a project involves clearing, grading, disturbances to the ground, such as <br /> stockpiling, or excavation. Currently, construction activity that involves soil disturbances <br /> on construction sites one acre or greater or which are part of a larger common plan of <br /> development or sale require a construction storm water permit. <br /> Because construction associated with the project will disturb more than one acre, the <br /> property owner needs to obtain permit coverage under the NPDES General Permit No. <br /> CAS000002 for Discharges of Storm Water Associated With Construction Activity. Before <br /> construction begins, the proponent must submit a Notice of Intent (NOI) to comply with the <br /> permit to the State Water Resources Control Board and a Stormwater Pollution Prevention <br /> Plan (SWPPP) must be prepared. The permitting requirement applies both at the <br /> excavation site and the processing facility. <br /> California Environmental Protection Agency <br /> C.* Recycled Paper <br />