Laserfiche WebLink
7. AIR POLLUTION CONTROL (Staff Contact: Jessica Willis, 559-230-5800) <br /> a. Regulation VIII (Fugitive PM10 Prohibitions) Regulation VIII (Rules 8011 —8081)is a series of rules <br /> designed to reduce PM10 emissions (predominantly dust/dirt)generated by human activity, including <br /> construction, road construction, bulk materials storage, landfill operations, etc. If a nonresidential <br /> project is 5.0 or more acres in area, a Dust Control Plan must be submitted as specified in Section <br /> 6.3.1 of Rule 8021. If a nonresidential site is1,0 to less than 5.0 acres, an owner/operator must <br /> provide written notification to the District that at least 48 hours prior to his/her intent to begin any <br /> earth moving activities (see Section 6.4.2). A compliance assistance bulletin has been enclosed for <br /> the applicant. The District's Dust Control Plan template is available at <br /> http:/twww.valleyair.org/busind/comply/PM 1 O/forms/DC P-Form°/*20--%2010-14-2004.pdf. <br /> b. Rule 4101 (Visible Emissions): This rules prohibits emissions of visible air contaminants to the <br /> atmosphere and applies to any source operation that emits or may emit air contaminants. The <br /> applicant must contact the District's Small Business Assistance Office at 559-230-5888 to receive <br /> additional information/instructions. <br /> 8. DEPARTMENT OF WATER RESOURCES (Staff Contact: Christopher Huitt, 916-653-5791) <br /> a. If the project encroaches on an adopted flood control plan, the applicant will need to obtain an <br /> encroachment permit from the Reclamation Board prior to initiating any activities. The permitting <br /> process may take as much as 45 to 60 days to process. A condition of the work permit requires the <br /> securing of all the appropriate additional permits before initiating work. <br /> 9. CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD(Staff Contact: Timothy O'Brian, 916- <br /> 464-3291) <br /> a. Waste Discharge Requirements: Because waste water will be generated, stored, or disposed on the <br /> site,WDRs may be required. In accordance with California Water Code Section 13260, the project <br /> proponent is required to submit a Report of Waste Discharge(RWD) at least 150 days'prior to <br /> discharging waste water at the site. <br /> b. Construction Storm Water Permit: A National Pollutant Discharge Elimination System (NPDES) <br /> General Permit for Storm Water Discharges Associated with Construction Activities, Order No. 99- <br /> 28-DWQ, is required when a project involves clearing, grading, disturbances to the ground, such as <br /> stockpiling, or excavation. Currently, construction activity that involves soil disturbances on <br /> construction sites one acre or greater or which are part of a larger common plan of development or <br /> sale requires,a construction storm water permit. <br /> c. Because construction associated with the project will disturb more than one acre, the property owner <br /> needs to obtain permit coverage under the NPDES General Permit No. CASOOo002 for Discharges <br /> of Storm Water Associated With Construction Activity. Before construction begins, the proponent <br /> must submit a Notice of Intent(NO[)to comply with the permit to the State Water Resources Control <br /> Board, and a Storm Water Pollution Prevention Plan(SWPPP) must be prepared. The permitting <br /> requirement applies both at the excavation site and the processing facility. <br /> d. Water Quality Certification—Wetlands: If a U. S. Army Corps of Engineers(ACOE) permit is <br /> required due to the disturbance of wetlands, then Water Quality Certification must be obtained from <br /> the Regional Board prior to initiation of project activities. Section 401 of the Federal Clean Water Act <br /> requires that the project proponent for any project that impacts surface waters of the United States <br /> (such as streams and wetlands) must request a 401 Water Quality Certification from the Regional <br /> Board. Water Quality Certification must be obtained prior to initiation of project activities. The <br /> proponent must follow the ACOE 404(b)(1) Guidance to assure approval of the 401 Water Quality <br /> San Joaquin County PA-0500224/Delta Habitat& Education Foundation <br /> Community Development Page 11 <br />