Laserfiche WebLink
MITIGATION MO l( )RING PROGRAM <br /> rookery instructing people to keep noise to a minimum and pets <br /> shall be prohibited from any area within 820 feet meters of the <br /> rookery. <br /> Special Status Fish To avoid significant impacts on Chinook salmon,steelhead,Delta *A note shall be RWQCB/COG <br /> smelt,and green sturgeon in the San Joaquin River,the following placed on the (GREEN <br /> avoidance and minimization measures shall be implemented: Improvement STURGEON)/ <br /> In-channel construction(i.e.,below the Ordinary High Water Plan indicating CDD <br /> Mark)shall be limited to the summer low-precipitation period when <br /> (June 1—October 1)to reduce the likelihood of adverse effects on construction <br /> adult fish spawning and migration. activity shall <br /> occur along with <br /> Pile-driving activities shall be limited to the summer low-flow mitigation <br /> period(June I—October 1),which decreases the distance the measures. <br /> sound waves travel. <br /> *TIMING:AT <br /> The number and size of piles shall be limited to the minimum TIME OF <br /> necessary to meet the engineering and design requirements of the BUILDING <br /> project. PLAN <br /> The smallest pile driver and minimum force necessary shall be SUBMITTAL <br /> used to complete the work. <br /> *Every six <br /> The use of treated wood timbers or pilings shall be avoided to the months,a report <br /> extent practicable. The use of alternative materials such as shall be <br /> untreated wood,concrete,or steel shall be used. submitted by <br /> Jones and <br /> No dredging shall be done for the old or new dock construction. Stokes to <br /> Dock construction shall occur during the summer RWQCB and <br /> low-precipitation period(June I—October 1)to reduce the COG with <br /> likelihood of adverse effects on adult fish spawning and updates of <br /> migration. construction <br /> activity. <br /> To minimize the creation of predator habitat from new dock <br /> construction,the following measures shall be implemented: *TIMING: <br /> Minimize the amount of overwater structures and design docks, ON-GOING <br /> where practicable,to maximize the amount of light penetration. <br /> The floating dock shall be connected to an elevated walkway to <br />