Laserfiche WebLink
F <br /> ame: Hog Island <br /> me: Phase I <br /> pared: February 25 2004 <br /> ULE A-CONSTRUCTION ESTIMATE SHEET <br /> 7EA <br /> IT ITEM <br /> UNIT PRICE TOTAL <br /> MOBILVATIOIN&SITE PREP <br /> Barge transport to and from islandGarden shed-storage container $ 15.000.00 S -"15.00D.OD <br /> Portable toilet tent set up $ A)O S 70Q.DD$ 1ZQ:00 i l 120.00 <br /> EQUIPMENT&FUEL <br /> BobcaUSkid Steer with land clearing attachment Miscelaneous power hand tools and fuel(chainsaw,weedeaters,etc $ 1,240:00 $ 1'500'00 <br /> Miscellaneous accessories(back braces,trowels,gloves,etc) ) ; � $ '�$ 250.00 $STRUCTURE40 foot dock and 80 foot gangway <br /> 8 100 LF Elevated Boardwalk and lookout for marsh viewing-composite lumber $ ��.00 $ 92,5tm.00 <br /> 9 20 FA Tent Platforms 111 225.00 $ 32.500.00 <br /> 10 2 EA Outhouse $ 1,000.00 3 20,000.00 <br /> 11 20 EA Rail Road Ties Humber for steps stee S 3''OW'� $ 70.000.00 <br /> p _ p porion of trail 9uble4sl $ 50.00 $ 1,000.00 <br /> $ 146;000.00 <br /> OTHER <br /> 12 1 LS Misc Signage(private property, no wake,etc.) <br /> 13 1 EA Interpretive sign and base $ 200.00 $ 200.00 <br /> $ 5,0130.00 $ 5,000.00 <br /> $ 5,2DO.00 <br /> CONSTRUCTION ESTIMATE SUBTOTAL $ 169,010.00 <br /> CONTINGENCY(25%) $ 42,252.50 <br /> CONSTRUCTION ESTIMATE TOTAL $ 211,262.50 <br /> Outhouse options: <br /> Pre-Fab Shed $50041,000 <br /> Self contained composting toilet $1,300 <br /> Pre fab composting toiled and building(not including solar power for fan) $35,000 <br /> X:\Active Jobs\Hog Island\Documents\Qty&Costs\Phase 1 Cost Estimate 022305.xis <br />