Laserfiche WebLink
LCC : 3-14-90 <br /> SA-89-45 <br /> Page 2 <br /> Approval Application No. SA-89-45 . The construction of the <br /> classroom buildings will take place in an open-sided canopy type <br /> building. An office building and two storage buildings will be <br /> used for support activities. <br /> The plant will be in operation from 7 : 00 a. m. to 5 : 00 p.m. , five <br /> days a week. When the plant is opened, there will be 25 <br /> employees, which could grow to a maximum of 200 employees within <br /> the next four or five years. The applicant is anticipating 16 <br /> truck trips per day. The future canopy shown in the revised sitP <br /> plan is not part of this project . <br /> J <br />