My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008335
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEINEGUL
>
12644
>
2600 - Land Use Program
>
PA-1000142
>
SU0008335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:28 AM
Creation date
9/9/2019 10:19:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008335
PE
2690
FACILITY_NAME
PA-1000142
STREET_NUMBER
12644
Direction
S
STREET_NAME
STEINEGUL
STREET_TYPE
RD
City
ESCALON
APN
20722008 09
ENTERED_DATE
7/1/2010 12:00:00 AM
SITE_LOCATION
12644 S STEINEGUL RD
RECEIVED_DATE
6/30/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STEINEGUL\12644\PA-1000142\SU0008335\APPL.PDF \MIGRATIONS\S\STEINEGUL\12644\PA-1000142\SU0008335\CDD OK.PDF \MIGRATIONS\S\STEINEGUL\12644\PA-1000142\SU0008335\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 3. The District requires that existing irrigation pipelines, canals, ditches, structures, <br /> turnouts and drains on the created parcels (both District and Private) be shown on <br /> the Parcel and Tentative Subdivision Maps for review purposes. <br /> 4. The District requires full, unencumbered access, as determined solely by the <br /> District, to both sides of its facilities and will rehabilitate, at its cost, those facilities <br /> within its control that do not meet that standard. This work shall be performed by <br /> the District after receipt of recorded easements. <br /> 5. Relocation of District facilities to the benefit of the development must be coordinated <br /> and approved by the District. The District will not allow District facilities to be <br /> installed within roadways. The District shall be contacted for current Policy and <br /> preferred alternatives. All costs associated with design, approval and analysis of <br /> relocations, including reasonable attorney and consultant fees, shall be at the <br /> Developer's expense. <br /> 6. All irrigation facilities to the benefit of the development shall be built off the District's <br /> easements and rights-of-way. <br /> 7. The District shall not provide water to ponds except as approved by the Board of <br /> Directors. <br /> 8. Pre-consultation is recommended with District staff before the Tentative Map stage. <br /> REQUIREMENTS-IRRIGATION } <br /> 1. No additional irrigation delivery connections will be provided as a result of i <br /> development unless approved by the Board of Directors. New points of delivery as I <br /> approved by the Board shall be at the expense of the Developer and shall be <br /> subject to a new service connection charge and water rate to be determined by the <br /> Board of Directors. For agricultural lands that continue to be farmed, the District <br /> shall make available a consensual lien process to defer the cost of new delivery <br /> installations until such time as the parcels are sold. <br /> 2. The historical water delivery point for the developed property will continue to be the <br /> point of diversion for the development. All existing points of delivery which do not <br /> meet current District standards shall be replaced at the expense of the Developer. <br /> 3. The historical water delivery volume for the developed property will not increase as <br /> a result of development. All points of delivery shall be measurable, as per District <br /> standards. <br /> 4. The historical water delivery point and flow volumes will be determined by the <br /> District. The District may, at its sole discretion, reduce the number of historical <br /> delivery points on any development. <br /> 5. !rands being developed which are currently using a District pipeline as a service line <br /> shall reconfigure the delivery of water to a single point of delivery compliant with <br /> existing District standards. <br /> 6. Parcels within the proposed development that continue to irrigate shall have water <br /> made available under one of three options; <br /> Revised September 2005 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.