Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SA-98-59 <br /> DaSilva <br /> Site Approval Application No. SA-98-59 was approved by the San Joaquin County Community <br /> Development Department on September 24, 1998. The effective date of approval is October 4, <br /> 1998. This approval will expire on April 4, 2000, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been secured and remain in force, and (3) all necessary permits from other <br /> agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as Ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other Ordinance <br /> requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Chandler Martin, 468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-AG OR GARAGE BUILDING PERMIT." <br /> The Site Plan required as a part of the building permit must show drainage, driveway access <br /> details (including gates), on-site parking, landscaping, signs, existing and proposed utility <br /> services, and grading (refer to the "SITE PLAN CHECK LIST' for details). A fee is required <br /> for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for expansion to an existing dairy to be completed in two <br /> phases as shown on the Plan submitted August 17, 1998. Phase I includes an 18,882- <br /> square-foot milking parlor. Phase II includes two 12,720-square-foot cattle shade structures <br /> and one 22, 725-square-foot cattle shade structure. Approval for Phase II will expire on <br /> December 31, 2000, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary <br /> permits from other agencies have been issued and remain in force. <br /> C. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site Plan. <br /> Drainage calculations prepared by a registered civil engineer or architect shall be included. <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All new parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a durable, dust-free surface. <br /> Bumper guards shall be provided where necessary to protect adjacent structures or <br /> properties. (Development Title Section 9-1015.5) <br /> (2) One space is required for every employee, including one handicap space. <br /> (Development Title Section 9-1015.3) <br /> Conditions of Approval - 1 - SA-98-59 <br />