Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-02-279 <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $703.00 per <br /> 1,000 gross square foot of building designated as Manufacturing in the Stockton area. The <br /> fee shall be automatically adjusted July I of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $197.00 per 1,000 gross square foot of building designated as Manufacturing. The fee <br /> shall be automatically increased on January I of each year through the year 2005 at the rate <br /> of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:sh <br />