Laserfiche WebLink
oPq�1�. Al. PLICATION — LOT LI6 _c ADJUSTMENT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> a .y <br /> FILE NUMBER: <br /> <<F ORN <br /> PROPOSED PARCELS <br /> Existing Square Proposed Square <br /> Parcel Number Existing or Proposed Use of Parcel Footage or Acreage Footage or Acreage <br /> 1 Residence/Grazing Land N/A 16.9 AC <br /> 2 Residence/Grazing Land 56.9 AC 40 AC <br /> 3 Grazing Land 12.5 AC 14.8 AC <br /> 4 Grazing Land 104.5 AC 103.5 AC <br /> SITE IMPROVEMENTS AND SERVICES <br /> Water <br /> Annex-Formation Distance to Public <br /> Public Water Service Provider Re wired I Water Feet <br /> Proposed ❑ <br /> Existin <br /> Private Water❑ Existin Well ® New Well ❑ Well Re lacement ❑ <br /> Sewage Disposal <br /> Annex-Formation Distance to Public <br /> Public Sewage Required Sewer Facility <br /> Disposal Service Provider <br /> Proposed ❑ <br /> Existin <br /> On-site Sewage New Se tic S stem ❑ Other ❑ <br /> Disposal El Existin Se tic S stem 171 <br /> Storm Drainage <br /> Public StormAnnex-Formation Terminal Drainage Detention-Retention <br /> Drainage Service Provider(if Public) <br /> Proposed ❑ I Required to: Ponds <br /> Existing ❑ <br /> Private Storm <br /> Draina e❑ On-site Retention Ponds ❑ Natural Drainage/No Chane ® Other ❑ <br /> Electricity Telephone Service <br /> Distance to <br /> Service Provider Service Service Provider Distance to Service <br /> P.G.&E. Adjacent Verizon Adjacent <br /> School Service Fire Protection Service <br /> Service Provider School Distance to Elem Service Provider Distance to Fire Station <br /> Lodi Unified 0.9 Miles Clements 1 Mile <br /> Existin Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> East State Route 12 100' 40' Yes❑ No® Yes❑ No <br /> Yes❑ No❑ Yes❑ No❑ <br /> Pro osed Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> N/A Yes E] No ElYes E] No El <br /> Yes❑ No❑ Yes❑ No❑ <br /> F:\DEVSVC\Planning Application Forms\ Page 4 of 7 <br /> Lot Line Adjustment.doc.(Revised 05-11-09) <br />