Laserfiche WebLink
Christine Luckasen, Project Manager <br /> Page 2 <br /> February 19, 2019 <br /> • Upon completion of any development that changes existing Special Flood Hazard Areas, <br /> the NFIP directs all participating communities to submit the appropriate hydrologic and <br /> hydraulic data to FEMA for a FIRM revision. In accordance with 44 CFR, Section 65.3, <br /> as soon as practicable, but not later than six months after such data becomes available, a <br /> community shall notify FEMA of the changes by submitting technical data for a flood <br /> map revision. To obtain copies of FEMA's Flood Map Revision Application Packages, <br /> please refer to the FEMA website at hLtp://www.fema.gov/business/nfip/forms.Shtm. <br /> Please Note: <br /> Many NFIP participating communities have adopted floodplain management building <br /> requirements which are more restrictive than the minimum federal standards described in 44 <br /> CFR. Please contact the local community's floodplain manager for more information on local <br /> floodplain management building requirements. The Lodi floodplain manager can be reached by <br /> calling Wally Sandelin, Director, Public Works Department, at(209) 333-6706. The San <br /> Joaquin County floodplain manager can be reached by calling John Maguire,Engineering <br /> Services Manager, at(209) 953-7617. <br /> If you have any questions or concerns,please do not hesitate to call Brian Trushinski of the <br /> Mitigation staff at(510) 627-7183. <br /> Sincerely, <br /> Gregor Blac urn, CFM, Branch Chief <br /> Floodplain Management and Insurance Branch <br /> Cc: <br /> Wally Sandelin,Director, Public Works Department, City of Lodi <br /> John Maguire,Engineering Services Manager, San Joaquin County <br /> Ray Lee, WREA, State of California,Department of Water Resources,North Central Region <br /> Office <br /> Brian Trushinski,NFIP Planner,DHS/FEMA Region IX <br /> Alessandro Amaglio,Environmental Officer, DHS/FEMA Region IX <br /> w .fema.gov <br />