Laserfiche WebLink
Chandler Martin -2` <br /> COMMUNITY DEVELOPMENT <br /> PA-07-021 (UP) <br /> 2. The Regional Traffic Impact Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $780.00 per 1000 gross square foot of building, <br /> designated as Industrial. The fee is based on the current schedule. (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> NMC:DG:av <br />` P:ICOMMENTS\LMYR 2007TA-0700021 APPLICATION.wpd _ <br /> I <br /> III <br /> 4 <br /> I <br />