Laserfiche WebLink
t <br /> f. The frontage improvements for Flag City Boulevard (formerly DeBroggi Road) across <br /> Parcel 1 shall be constructed in conformance with the standards for one-half of a 60-foot- <br /> wide right-of-way commercial street. <br /> In the event the developer chooses to relocate Flag City Boulevard (formerly DeBroggi <br /> Road) right-of-way easterly 50 feet, <br /> iAG-I'-1diA9 portions of th.n a3damsioF;r. Qf Flag Gly Boulevard aAd Diagmqqi Read, w <br /> abandonment of the existing right-of-way shall be <br /> accomplished by separate instrument(s). [n any event the developer shall dedicate the <br /> 60' right-of-way for Flag City Boulevard from State Highway 12 south to DeBroggi Road <br /> and including the easterly extension of DeBroggi Road, as a 60'_right-of-way commercial <br /> road. The developer shall construct the realigned Flag City Boulevard to County <br /> standards for a 60-foot-wide commercial roadway from the edge of pavement of State <br /> Highway Route 12 to the beginning of the curve to DeBroggi Road. <br /> The developer shall construct a transition section to County standards for a 60-foot-wide <br /> commercial roadway from the realigned section of Flag City Boulevard to the existing Flag <br /> City Boulevard realignment. Construction of the remainder of Flag City Boulevard and <br /> DeBroggi Road may be deferred until additional development occurs on the remainder <br /> parcel. The developer shall obtain all necessary permits from Caltrans to construct the <br /> State Highway Route 12 intersection with Flag City Boulevard. (Development Title Section <br /> 9-1100.3) <br /> g, All easements of record shall be shown on the Parcel Map. (Development Title Section <br /> 9-910.20) <br /> h. <br /> The project shall construct a temporary storm drainage retention l2ond, which_ has <br /> sufficient capacity to serve Parcel 1 in accordance with County standards and maintained <br /> by County, Service Area No. 31. A master plan shall be prepared prior to the develop- <br /> ment of property beyond Parcel 1 and a community retention and terminal drains e <br /> s stem which shall be integrated with the drainage system currently under construction <br /> for the Flag City Proiect shall be constructed. The design of the terminal drainage system <br /> shall recognize the design of the outfall line constructed by Flag City, which was sized <br /> only to serve Flag City. <br /> i. The project shall provide a public water system that is connected to the water system of <br /> County Service Area No.31 and conforms to the requirements of the San Joaquin County <br /> Public Health Services (Environmental Health Division) and the Department of Public <br /> Works. The public water system shall include a well, which may be deferred, if the <br /> developer installs a reservoir with a booster Rump or pressure tank which has sufficient <br /> -8- <br />