Laserfiche WebLink
GENERAL CONSIDERATIONS : <br /> Does . _ appear that any environmental feature of the project <br /> will Generate significant public concern or controversv? <br /> ( ) Yes .-A No Nature cf concern(s) : <br /> 2 . will the project require approval or permits by agencles other <br /> than the Countv? ( ) Yes (�l No <br /> Agency name (s) : <br /> � . Is the project within the Sphere of Influence, or within two <br /> :wiles, of any city? <br /> 1\4 Yes ( ) No City: Lu D-1 <br /> ENVIRONMENTAL IMPACTS : <br /> "Yes" may only be checked in situations where there is substantial evidence to <br /> __ndicate that there may be a significant adverse impact on ne environment <br /> =^ere is no change in the project description. (CEOA Guidelines, Sec. 15064) <br /> See the "Discussion" section at the end of the Initial Study for explanation of <br /> any impacts checked "Yes", or any "No" answer marked with an asterisk (-) . <br /> Sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> Original source materials and maps on file in the Community Develooment <br /> Department including: a_1 county and City general plans and community pians; <br /> assessor parcel books; various local and FEMA flood zone :naps; service district <br /> maps; maps or -=sgeologic instability; maps and reporon endangered species such <br /> as the Natural Diversity Data Base; noise contour maps; specific roadway plans; <br /> mans and/or records of archeological/historic resources; soil reports and mans; <br /> etc. Many of these original source materials have been collected 'from other <br /> pumlic agencies or from trevicusly prepared IIR' s and other technical stucies. <br /> Additional standard sources which should be specifically .._ted below include <br /> on-site visits by staff (note date) ; staff knowledge or exper_ence; and <br /> ^.dependent environmental studies submitted to the County as part of t:ze projec= <br /> application (note report title, date, and consultant) . <br /> YES No <br /> 1. WATER: <br /> a. Is anv portion of the project <br /> subject to flood hazard? > <br /> Flood zone C <br /> nitial Study (Rev: 01/91) <br /> 2 <br />